QINFA MINING

HIGH EFFICIENCY

The power generation efficiency is more than 41%, and the comprehensive utilization efficiency is more than 87%

LOW EMISSION

No,≤ 500mg/Nm2 (2g/kW . h)

HIGH RELIABILITY

The overhaul period of the unit is 48,000hours, and the annual operation hours are as high as 8000 hours

LOW LUBRICATING OIL CONSUMPTION

Lubricating oil consumption≤0.2g/kWh

PRODUCT SPECIFICATIONS

16 Cylinders, 170/195mm Stroke, 70.8dm3 Displacement, 1500rpm Rotating Speed, 6820mm Length, 1700mm Width, 2615mm Height, 15t Dry Weight Genset, ≤ 0.2g/kWh AC of Lube Oil

EASY MAINTENANCE

Professional maintenance personnel, sufficient spare parts warehouse, and complete service system.

HIGH SAFETY

The multi-level fire-against and anti-explosion design and advanced detonation control technology are employed.

COMPACT STRUCTURE

Small size and light weight, easy for mobilization

WIDE RANGE OF APPLICATIONS

It is used in natural gas, biogas, gas, biomass gas, landfill gas, industrial gas, petroleum associated gas and other gas power generation fields

EFFICIENT ENERGY OUTPUT

1ton of 5500cal Coal could generate 1200-1500kW electrical power.

VARIOUS GAS SOURCES

Biogas

Coalbed Methane

Furnace Gas

Petroleum Gas

Hydrogen

Landfill Gas

Liquefied Natural Gas

Compressed Natural Gas

KEY PROJECT OVERVIEW

COAL CONVERT TO GAS POWER STATION

(CATL Industrial Park – Karawang – West Java)

BACKGROUND

oCATL is world biggest EV battery provider and plan to establish an Integrated EV battery ecosystem industrial park in Karawang – Indonesia

PROVIDED LOW-COST ENERGY SOLUTION WITH QUICK INSTALLATION

PT. Garuda Naratama Resources has appointed by CATL to become the Independent Power Provide for the purpose to provide daily 2-4MW of Low-Cost Green Electricity for CATL’s Industrial Park construction period (around 36month)